top of page
Search

California Department of Water Resources Releases Delta Conveyance Project Draft EIR

  • Writer: Admin
    Admin
  • Aug 13, 2022
  • 1 min read

Larry Altman

August 10, 2022


“The EIR includes details of several Delta conveyance plans, including the Bethany Reservoir Alternative. This plan would build two intake facilities in the north Sacramento River Delta to channel 6,000 cubic feet of water per second to a single below-ground 45-mile tunnel along the east side of the Delta for its eventual ride through the California Aqueduct. A cubic foot is about 7.5 gallons.”


Read Full Article Here:



 
 
 

Comments


bottom of page